Decon History
Schedule of Events for Decon
1979: TMcG was calling by to PO flat in
No. 4 for free coffee
& the dissection of a calculator
c1986: TMcG and PO met at corner cafe in Baggot St
close by Hackett's
c1986: Irish clay Lotus-123 jobs
Developed this into a DBase production control system
c1986: TMcG signed up to Decon
1987: Went to Software Labs
1988-04: Decon started off in Rathmines
1988: Did stuff for IBMAC
Database system for managing a
conference scheduling, attendance and Technical Paper control
1988-04: First version of Tour System for Co-Op Travel (COOP or TOUR) in dBASE III PLUS
1988: Decon purchased
CLIPPER Clipper Systems developed
to 1995 TOUR
EARTH
PROCON
STREET
Rental collection system for
Wexford
XXXXXXXXXXXXXXXX
1989: Mark Sheeran appeared
1988: TMcG went over to London to Meridian for two week contract
1988-93: KC was hanging around. I bought Faircom & he was fiddling with that.
1989-04: We moved to Leeson St
1990-01: Peter joined in for a week doing stuff in C
1990-?: Brendan McGlynn appeared (IBM/AT&T).
Courtesy of him TMcG encountered his first real touchscreen!
1991-01: TMcG got Langdons
1991-02: We got Procut & Sovreign
1991-04: PROCON Version 3 released
1991-01: Helen for summer
1992-12: Version of STREET issued to Clonmell TC (Not paid)
1993: KC went off to Motorola Cork
1994-09: Upgrade of COOP issued
1994: TMcG went off to Motorola Cork
1995-01: Backup copy of SIAC EARTH data filed away
1996-08: Malahide positioning system developed for dredging in Malahide Marina